Jump to content

Peninsula 2


Guest

1 Screenshot

About This File

Goal: Peninsula needs an effective railway system to connect the capital Taboria to the provinces.

Author's Comments: Welcome to Peninsula! The Government has invited your company to build and run a railway system over a 40 year period.

Geografy: From the tropical coastland, Peninsula slopes towards the highland. Along the mainly agricultural coasts the crops are grain, produce, sugar, cotton and coffee and some cattle. The northern part of the highland is heavy industrialized. The southern highland is mainly agricultural with some logging industry and rubber plantations. In this scenario, a some events will have influence on the outcrop ("Record grain/sugar/fruit/cotton harvest", "Locusts destroys 50% of this years outcrop", "Cattle plague or "Wood fires") . This "build and have fun" scenario is single player only.

Note: Space is reserved for quadouble track and/or bypasses around most of the big population centres in an attempt to avoid congestion. The train turnaround time is improved by 50%, traction +40% and acceleration +10%. Average distance between stations are 5-10 km.

First diesel in 1954, first electrics in 1918 with speed +25% from 1950, no TGV or other high speed trains.

Win conditions: BRONZE: 200 mill., SILVER: 300 mill., GOLD: 500 mill. of company book value within 40 years.


User Feedback

Recommended Comments

There are no comments to display.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...